TECHNICAL DATA
Project | TCM Continuous line |
Project Description | Detail design and civil works for the tcm continuous line (welder, looper and pickle line) |
Technological Supplier | SMS Group |
Presence at site | OCT 2015 – JAN 2016 |
Reinforced Concrete | m³ 3.500 |
Formworks | m² 6.750 |
Reinforcement Steel | t 350 |
Embedded Steel | Kg 49.000 |
Micropiles | n 539 (m 9.700) |