Siderurgica Triestina – Trieste (TS), Italy

TECHNICAL DATA

Project TCM Continuous line
Project Description Detail design and civil works for the tcm continuous line (welder, looper and pickle line)
Technological Supplier SMS Group
Presence at site OCT 2015 – JAN 2016
Reinforced Concrete m³ 3.500
Formworks m² 6.750
Reinforcement Steel t 350
Embedded Steel Kg 49.000
Micropiles n 539 (m 9.700)