GENERAL INFORMATION
The following activities have been carried out:
- Update Benfield Ammonia 1
- Update Benfield Ammonia 2
- H2 Recovery
- Increase campaign length of HDS in A1 & A2
- Gas Metering Station
SCOPE OF WORKS
This projects includes:
- Installation of equipment
- Installation of all pipes
- Delivery of welding materials
- Piping supports delivery and installation
- Testing of lines as per design code
- PWHT (Post Weld Heat Treatment)
- Transportation of equipment and piping components on the site
- Installation of inline instruments
- Insulation of piping, equipment and materials
- Painting of carbon steel
- As built documentation
- Test ISO’s with indication of material heat nr., welder’s ID, NDE reference
TECHNICAL DATA
Project |
Upgrading Ammonia 1&2 Plant |
|
|
Total Reactors Erected |
n. 2 |
Reactors Weigth |
tons 80 each one |
Mechanical Equipment Installation |
tons 180 |
Piping & Support Installation |
tons 50 |
Insulation Installation |
m² 1,600 |
Painting Works |
m² 1,300 |