Lifeco – Marsa El Brega, Libya

GENERAL INFORMATION
The following activities have been carried out:

  • Update Benfield Ammonia 1
  • Update Benfield Ammonia 2
  • H2 Recovery
  • Increase campaign length of HDS in A1 & A2
  • Gas Metering Station

 

SCOPE OF WORKS
This  projects includes:

  • Installation of equipment
  • Installation of all pipes
  • Delivery of welding materials
  • Piping supports delivery and installation
  • Testing of lines as per design code
  • PWHT (Post Weld Heat Treatment)
  • Transportation of equipment and piping components on the site
  • Installation of inline instruments
  • Insulation of piping, equipment and materials
  • Painting of carbon steel
  • As built documentation
  • Test ISO’s with indication of material heat nr., welder’s ID, NDE reference

 

TECHNICAL DATA

Project Upgrading Ammonia 1&2 Plant
Total Reactors Erected n. 2
Reactors Weigth tons 80 each one
Mechanical Equipment Installation tons 180
Piping & Support Installation tons 50
Insulation Installation m² 1,600
Painting Works m² 1,300