Ferrero – San José Iturbide, Mexico

TECHNICAL DATA

Project New manufacturing plant: chocolate production
Project Description Design and Construction
Civil Engineering Ferretti International / Constructora Chufani
Production Area m² 28,831.78
Mezzanine m² 8,560.94
Offices Ground Floor m² 760.41
Office Mezzanine m² 3,847.60
Guard House m² 196.78
Steel Structures 73,570
Piling Works
1,013 piles, diam. 40/60 cm., 4/5 m. depth
HVAC System 37 air handler units from 800 cfm to 33,000 cfm
Natural Gas System Capacity: For steam generators 1,200 m3/hr, for process: 260 m³/h
Fire Protection System Fire water tank capacity: 120,000 gal
Electrical Installation Substation capacity: 10 MVA; Number of transformers: 7 Dry cast type
Pipe Rack Pipe rack for services: length 1,050 ml , Pipe rack for production: 980 ml
Epoxy Area: m² 27,300