TECHNICAL DATA

Year of execution 2007
Pre-shutdown works Civil Engineering
Pre-assembled blocks kg 150,000
Rebar positioning kg 100,000
Formworks m³ 2,000
Shut down period 7 calendar days
Demolition m³ 2,200
Excavation m³ 3,000
Lean concrete pouring m³ 250
Foundation slab blocks positioning kg 100,000
Foundation slab pouring m³ 1,500
Wall block positioning kg 150,000
Wall formwork’s completion m² 2,000
Walls pouring m³ 1,500
Formworks removal and cleaning m² 2,000