Fast-Track Revampings

Quality & safetyA specific, pre-assembled foundation technology has been developed to refurbish existing foundations, thus reducing shutdown times. This technology consists of prefabricated units equipped with conduits, reinforcement steel, metal inserts, anchor boxes and formwork prepared before plant shutdown.
A new plant reducing of 70% the intervention time!
Achieving this target is a goal generated first of all by the skill of Ferretti International staff: being able to take care of the whole revamping intervention, from controlled demolition of the existing plant, up to the installation of the new one.